Price | negotiable |
MOQ | 1 |
Delivery Time | 2-5 working days after payment received |
Brand | SINOMATIC |
Place of Origin | SHENZHEN, CHINA |
Certification | CE/ ISO |
Model Number | LC-R075 |
Packaging Details | CARTON |
Payment Terms | T/T, L/C, D/A, D/P, Western Union, MoneyGram |
Supply Ability | 3,0000pcs per month |
Place of Origin | SHENZHEN, CHINA | Packaging Details | CARTON |
Model number | LC-R075 | Model Number | LC-R075 |
Supply Ability | 3,0000pcs per month | 10-25 meters | 3 turns |
Certification | CE/ ISO | Brand Name | SINOMATIC |
Payment Terms | T/T, L/C, D/A, D/P, Western Union, MoneyGram | 6-10 meters | 4-5 turns |
Price | negotiable | Delivery Time | 2-5 working days after payment received |
Minimum Order Quantity | 1 | Conductor Material | tinned copper wire |
3-6 meters | 5-6 turns | Application | underground |
50 And 100 Meters Per Roll Temperature Resistant Loop Wire Coil Cable For Loop Detector
What is loop detector cable?
Used in vehicle monitoring equipment for detection of traffic movements via creation of inductive loop to frequency
signal flowing in cable and metallic parts of vehicle. These cables are designed for installation in a slot cut into
the carriageway.
Loop Wire Coil Cable Feature:
High temperature resistance - use working temperature up to 250 °C.
Low
temperature
resistance
-
good
mechanical
toughness;
5%
elongation
even
at
temperatures
down
to
-196
°C.
Corrosion
resistant
-
inert
to
most
chemicals
and
solvents,
resistant
to
strong
acids
and
bases,
water
and
various
organic solvents.
Weather
resistant
-
the
best
aging
life
in
plastics.
Highly
lubricated
–
the
lowest
coefficient
of
friction
in
solid
materials.
Non-adhesive
-
is
the
smallest
surface
tension
in
solid
materials
and
does
not
adhere
to
any
substance.
Non-toxic
-
physiologically
inert,
long-term
implantation
of
artificial
blood
vessels
and
organs
without
adverse
reactions.
INSTALLATION TIPS
1. The detector should be installed in a waterproof housing as close to the loop as possible.
2.
The
loop
and
feeder
should
be
made
from
insulated
copper
wire
with
a
minimum
cross-sectional
area
of
1.5mm2.
The feeder should be twisted with at least 20 turns per meter. Joints in the wire are not recommended and must be
soldered and made waterproof. Faulty joints could lead to incorrect operation of the detector. Feeders which may
pick up electrical noise should use screened cable, with the screen earthed at the detector.
3.
The
loop
should
be
either
square
or
rectangular
in
shape
with
a
minimum
distance
of
1
meter
between
opposite
sides.
Normally 3 turns of wire are used in the loop. Large loops with a circumference of greater than 10 meters should use 2
turns while small loops with a circumference of less than 6 meters should use 4 turns. When two loops are used in close
proximity to each other it is recommended that 3 turns are used in one and 4 turns in the other to prevent cross-talk.
4.
Cross-talk
is
a
term
used
to
describe
the
interference
between
two
adjacent
loops.
To
avoid
the
incorrect
operation
of the detector, the loops should be at least 2 meters apart and on different frequency settings.
5.
For
single
channel
loop
detectors
installation,
slots
should
be
cut
in
the
road
using
a
masonry
cutting
tool.
A
45o
cut
should be made across the corners to prevent damage to the wire on the corners. The slot should be about 4mm wide
and 30mm to 50mm deep. Remember to extend the slot from one of the corners to the road-side to accommodate the
feeder.
6.
Best
results
are
obtained
when
a
single
length
of
wire
is
used
with
no
joints.
This
may
be
achieved
by
running
the
wire from the detector to the loop, around the loop for 3 turns and then back to the detector. The feeder portion of the
wire is then twisted. Remember that twisting the feeder will shorten its length, to ensure a long enough feeder wire is
used.
7.
After
the
loop
and
feeder
wires
have
been
placed
in
the
slot,
the
slot
is
filled
with
an
epoxy
compound
or
bitumen
filler.
INSTALLATION STEPS
Model | LC-R075 |
color | red |
Material | tinned copper wire |
Below 3 meters | Ensure that the inductance value is between 100uH and 30OuH |
3-6 meters | 5-6 turns |
6-10 meters | 4-5 turns |
10-25 meters | 3 turns |
Below 25 meters | 2 turns |
The scope of work | Between 100uH-300uH |